September 9, 2001  The crosshairs on our jig are shown here. the OSB has been popped out with a screwdriver. The chase in the foam is visible in the bottom of the cutout. The foam was removed with a drywall saw and debris vacuumed out.

It took three months to install the boxes and pull wire. We used over five miles of wire and cable of various types.