|
![]() |
September 9, 2001 The crosshairs on our jig are shown here. the
OSB has been popped out with a screwdriver. The chase in the foam is visible
in the bottom of the cutout. The foam was removed with a drywall saw and
debris vacuumed out. It took three months to install the boxes and pull wire. We used over five miles of wire and cable of various types. |